29 SEP 2007 TF Professional AN/TPQ-36 Movement Level 1 CONOP
2007-09-28 18:30:00 Expand acronyms:

TASK ORG

- 2 x Hook-up Teams (TF Professional)
- 2 x CH-47s, AMC is CW2 Patrick (TF Desert Hawk)

Mission Statement:

TF Professional conducts aerial sling load of AN/TPQ-36 radar HMMWV and Antenna (Bumper #s 83Q and 84Q) from FOB Salerno to FOB Orgun-E on 29 Sep 07 IOT restore radar coverage in AO Eagle

Commanders Intent
Purpose:

Transport AN/TPQ-36 HMMWV and Antenna from FOB Salerno to FOB Orgun-E IOT restore radar coverage in AO Eagle

Conduct sling load operations of AN/TPQ-36 HMMWV and Antenna without damage to the radar or injury to personnel

Key Task:
Move 1 x Q36 Shelter and 1 x Q36 Fire Finder Radar antenna from FOB Salerno (42S WB 90285 92526) to FOB Orgun-E
(42S WB 2500 1160 )

Scheme of Maneuver:
Q36 HMMWV (Bumper #83Q) and Q36 Antenna (Bumper #84Q) are rigged at FOB Salerno 29 SEP 07. At 1730Z 2 x CH-47s tail #? and #? (AMC CW4 Foley) will land at FOB Salerno, the crew chief for each A/C will exit and verify the load, and take 1 copy of the inspection certification checklist from SFC Beattie. After load is verified Tail number ? will lift off and position to pick up radar shelter (Bumper # 83Q). Once tail #? has cleared the PZ, tail #? will lift off and position to lift antenna (Bumper #84Q). After both loads are airborne the aircraft will move to LZ Orgun-E at FOB Orgun-E and drop both the Q36 HMMWV (Bumper #83Q) and Q36 Antenna (Bumper #84Q)

Note:
Tail #?, last sling load conducted
11 SEP 07
Tail #?, last sling load conducted 11 SEP 07
Crew certification conducted May and August 07
Q-36 HMMWV weight 8,620 lbs
Q-36 Antenna weight 3,140 lbs



Fonte:Wikilieak